WORKS

Our works which were carried out on behalf of TLI included the civil works for 110 kV and 38 kV underground ducting which will facilitate connection to the 110 kV transmission system operated by EirGrid.

These diversion works were necessary for the development of data centres next to Huntstown power station.  We installed a fully ducted solution of over 35,000 metres allowing for the future cable installation.

CLIENT